The 25-km long Udhampur-Katra line, commissioned after prolonged delays, has been built at an estimated cost of Rs. 1,132.75 crore.
The train will traverse through seven tunnels and over 30 small and large bridges. There will be a small station — Chak Rakhwal — between Udhampur and Katra.